Healthcare infrastructures are a typical risky investment, which can be financed in many different and competing ways, and Public Private Partnership and project financing techniques are increasingly recognized as a useful and appropriate device. Risk identification, transfer, sharing and management are a key point of the whole structure and the risk matrix, used in order to classify and - wherever possible - measure risk is an unavoidable part of the investment package. To the extent that it can be professionally managed by specialized agents, risk sharing or transmission is not a zero sum game, even if risk pricing is never a trivial issue. While the public part traditionally bears core market risk (demand for health services), other key risks, such as those related to construction and management of commercial (hot) activities, are typically transferred to the private part, often represented by a private entity. A corporate finance perspective is crucial for preparing a proper business model, where economic and financial flows are projected along the time span of the investment, with managerial and strategic insights for not ephemeral sustainability. Capital structure issues, rotating around (optimal) leverage, are eventually discussed, starting from a Modigliani & Miller framework, with practical insights and sensitivity analyses.
Published in | Journal of Investment and Management (Volume 2, Issue 1) |
DOI | 10.11648/j.jim.20130201.12 |
Page(s) | 10-22 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2013. Published by Science Publishing Group |
PPP, Hospitals, Discounted Cash Flows, Modigliani & Miller Theorems, Cost of Capital, Risk, Leverage, Bankability, Corporate Governance
[1] | BARLOW J., KOBERLE-GAISER M., (2008), The Private Finance Initiative, Project Form and Design innovation. The UK’s Hospitals Programme, Research Policy, vol. 37, Is. 8, September. |
[2] | RECHEL B., WRIGHT S., EDWARDS N., (2009), Investing in Hospitals of the Future, World Health Organisation, Regional Office Europe. |
[3] | AKINTOYE A., CHINYIO E., (2005), Private Finance Initiative in the Healthcare Sector: trends and Risk assessment, Engineering, Construction and Architectural Management, vol. 12, Is. 6, pp. 601-616. |
[4] | EADIE R., MILLAR P., GRANT R., (2013), PFI/PPP, Private Sector Perspectives of UK Transport & Healthcare, Built Environment Project and Asset Management, vol.3, Is. 1. |
[5] | HENJEWELE C., SUN M., FEWINGS P., (2011), Critical Parameters Influencing Value for Money Variations in PFI Projects in the Healthcare and Transport Sectors, Construction, Management and Economics, vol. 29, Issue 8, pp. 825-839. |
[6] | HENJEWELE C., SUN M., FEWINGS P., (2013), Comparative Performance of Healthcare and Transport PFI Projects. Empirical Study of the Influence of Key Factors, International Journal of Project Management, in press. |
[7] | HELLOWELL M., POLLOCK A.M., (2010), Do PPPs in Social Infrastructure Enhance the Public Interest? Evidence from England's National Health Service, Australian Journal of Public Administration, March. |
[8] | MALTBY N., (2007), Public Private Partnerships in the Health Sector, European Public Private Partnership Law Review, 211. |
[9] | NIKOLIC I.A., MAIKISCH H., (2006), Public-Private Partnerships and Collaboration in the Health Sector. An Overview with case studies from Recent European Experience, HNP discussion paper, World Bank, October. |
[10] | MARTINEZ M., PEZZILLO I., GALDIERO C., MERCURIO R., (2011), Public-Private Partnership in the Italian Healthcare Sector: the Analysis of Organizational Forms, November, http://ssrn.com/abstract=2014642. |
[11] | STICHLER J., (2008), Calculating the Cost of a Healthcare Project, Journal of Nursing Administration, vol. 38, Issue 2, pp. 53-57. |
[12] | BAIN R., PLANTAGIE J.W., (2007), The Anatomy of Construction Risk: Lessons From a Millennium of PPP Experience, Infrastructure Finance, Standard & Poor's Research Report, April 5. |
[13] | DEMIRAG I., KHADAROO I., STAPLETON P., STEVENSON C., (2011), Risk and the Financing of PPP: Perspectives from the Financiers, British Accounting Review, December. |
[14] | BACKHAUS K., WERTH SCHULTE H., (2006), Identification of Key Risk Factors in Project Finance: A project type - Based Simulation Approach, Journal of Structured Finance, Winter, 71. |
[15] | BEENHAKKER H. L., (1997), Risk Management in Project Finance and Implementation, Quorum Books, New York. |
[16] | GATTI S., CORIELLI F., STEFFANONI A., (2008), Risk Shifting Through Nonfinancial Contracts: Effects on Loan Spreads and Capital Structure of Project Finance Deals, May 5, 2008, 21st Australasian Finance and Banking Conference 2008 Paper. |
[17] | GATTI S., RIGAMONTI A., SAITA F., SENATI M., (2006), Measuring Value-at-Risk in Project Finance Transactions, European Financial Management, Volume 13, No. 1. |
[18] | GRIMSEY D., LEWIS M.K., (2002), Evaluating the risks of public private partnerships for infrastructure projects, International Journal of Project Management, 20, 107-118. |
[19] | LI B., AKINTOYE A., HARDCASTLE C., (2001), Risk Analysis and Allocation in Public Private Partnerships Projects, 17th Arcom Annual Conference, Salford, vol 2., pp. 895-904. |
[20] | ZULHABRI I., TORRANCE ABDULLAH J.V., (2006), Efficient Risk Allocation in Project Finance: Analysis of Literature Review, International Conference in the Built Environment in the 21th Century, 13-15, June. |
[21] | MORO VISCONTI R., (2012), Inflation Risk Management in Project Finance Investments, International Journal of Finance and Accounting, vol. 1, n. 6, November. |
[22] | DE MARCO A., MANGANO G., (2013), Risk and Value in Privately Financed Healthcare Projects, Journal of Construction, Engineering and Management, in press. |
[23] | ROBINSON H.S., SCOTT J., (2009), Service Delivery and Performance Monitoring, PFI/PPP projects, Construction Management & Economics, Vol. 27 Issue 2, pp. 181-197. |
[24] | CORI R., GIORGIANTONIO C., PARADISI, I., (2010), Risk Allocation and Incentives for Private Contractors: An Analysis of Italian Project Financing Contracts, Bank of Italy Occasional Paper No. 82. Available at SSRN: http://ssrn.com/abstract=1825983. |
[25] | DE MARCO A., MANGANO G., CAGLIANO C. A., GRIMALDI S., (2012), Public Financing into Build-Operate-Transfer Hospital Projects in Italy. Journal of Construction. Engineering and. Management, 138(11), 1294–1302. |
[26] | SMITH D.G., WHEELER J.R., RIVENSON H.L., REITER K.L., (2000), Sources of project financing in health care systems, Journal of Health Care Finance, Summer; 26(4):53-8. |
[27] | SHAH S., THAKOR A.V., (1987), Optimal Capital Structure and Project Financing, Journal of Economic Theory, 42, 207-243. |
[28] | SCHEINKESTEL N.L., (1997), The Debt-Equity Conflict: Where does Project Financing Fit? Journal of Banking and Finance Law and Practice, Vol. 8 (2), pp. 103-124. |
[29] | ROSS S.A., (1977), The Determination of Financial Structure: The Incentive-Signalling Approach, Bell Journal of Economics, Vol. 8, No. 1 (Spring), pp. 23-40. |
[30] | MYERS S.C., MAJLUF N.S., (1984), Corporate Financing and Investment Decisions when Firms have Information that Investors Do Not Have, Journal of Financial Economics, Vol. 13, No. 2, (June), pp. 187-221. |
[31] | SUBRAMANIAN K.W., TUNG F., WANG X., (2009), Law and Project Finance, working paper, February, http://papers.ssrn.com/sol3/papers.cfm?abstract_id=972415. |
[32] | MODIGLIANI F.; MILLER M. (1958). The Cost of Capital, Corporation Finance and the Theory of Investment. American Economic Review 48 (3): 261–297. http://www.jstor.org/stable/1809766. |
[33] | ESTY B.C., (2002), Returns on Project-Financed Investments: Evolution and Managerial Implications, Journal of Applied Corporate Finance, Spring, pp. 71-86. |
[34] | MORO VISCONTI R., (2010), The Cost of Debt for a Project Finance Initiative in the Italian Healthcare Sector (October 26), http://ssrn.com/abstract=1592946. |
[35] | MARTI S., LOWELL K., (2000), Cash Flow Volatility as Opportunity: Adding Sophisticated Insurance Capital to the Project Finance Mix, Journal of Project Finance, Fall, pp. 9-13. |
[36] | MIHART B., (2011), Healthcare Financing in Recession, Young Economists’ Journal, n. 17. |
[37] | POLLOCK A.M., PRICE D., LIEBE M., (2011), Private Finance Initiatives during NHS Austerity, British Medical Journal, February. |
APA Style
Roberto Moro Visconti. (2013). Managing Healthcare Project Financing Investments: A Corporate Finance Perspective. Journal of Investment and Management, 2(1), 10-22. https://doi.org/10.11648/j.jim.20130201.12
ACS Style
Roberto Moro Visconti. Managing Healthcare Project Financing Investments: A Corporate Finance Perspective. J. Invest. Manag. 2013, 2(1), 10-22. doi: 10.11648/j.jim.20130201.12
AMA Style
Roberto Moro Visconti. Managing Healthcare Project Financing Investments: A Corporate Finance Perspective. J Invest Manag. 2013;2(1):10-22. doi: 10.11648/j.jim.20130201.12
@article{10.11648/j.jim.20130201.12, author = {Roberto Moro Visconti}, title = {Managing Healthcare Project Financing Investments: A Corporate Finance Perspective}, journal = {Journal of Investment and Management}, volume = {2}, number = {1}, pages = {10-22}, doi = {10.11648/j.jim.20130201.12}, url = {https://doi.org/10.11648/j.jim.20130201.12}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.jim.20130201.12}, abstract = {Healthcare infrastructures are a typical risky investment, which can be financed in many different and competing ways, and Public Private Partnership and project financing techniques are increasingly recognized as a useful and appropriate device. Risk identification, transfer, sharing and management are a key point of the whole structure and the risk matrix, used in order to classify and - wherever possible - measure risk is an unavoidable part of the investment package. To the extent that it can be professionally managed by specialized agents, risk sharing or transmission is not a zero sum game, even if risk pricing is never a trivial issue. While the public part traditionally bears core market risk (demand for health services), other key risks, such as those related to construction and management of commercial (hot) activities, are typically transferred to the private part, often represented by a private entity. A corporate finance perspective is crucial for preparing a proper business model, where economic and financial flows are projected along the time span of the investment, with managerial and strategic insights for not ephemeral sustainability. Capital structure issues, rotating around (optimal) leverage, are eventually discussed, starting from a Modigliani & Miller framework, with practical insights and sensitivity analyses.}, year = {2013} }
TY - JOUR T1 - Managing Healthcare Project Financing Investments: A Corporate Finance Perspective AU - Roberto Moro Visconti Y1 - 2013/01/10 PY - 2013 N1 - https://doi.org/10.11648/j.jim.20130201.12 DO - 10.11648/j.jim.20130201.12 T2 - Journal of Investment and Management JF - Journal of Investment and Management JO - Journal of Investment and Management SP - 10 EP - 22 PB - Science Publishing Group SN - 2328-7721 UR - https://doi.org/10.11648/j.jim.20130201.12 AB - Healthcare infrastructures are a typical risky investment, which can be financed in many different and competing ways, and Public Private Partnership and project financing techniques are increasingly recognized as a useful and appropriate device. Risk identification, transfer, sharing and management are a key point of the whole structure and the risk matrix, used in order to classify and - wherever possible - measure risk is an unavoidable part of the investment package. To the extent that it can be professionally managed by specialized agents, risk sharing or transmission is not a zero sum game, even if risk pricing is never a trivial issue. While the public part traditionally bears core market risk (demand for health services), other key risks, such as those related to construction and management of commercial (hot) activities, are typically transferred to the private part, often represented by a private entity. A corporate finance perspective is crucial for preparing a proper business model, where economic and financial flows are projected along the time span of the investment, with managerial and strategic insights for not ephemeral sustainability. Capital structure issues, rotating around (optimal) leverage, are eventually discussed, starting from a Modigliani & Miller framework, with practical insights and sensitivity analyses. VL - 2 IS - 1 ER -